Case Study :
Wyoming Rib and Chop House Restaurant

6,640ft²

The fit-out included dining areas, a bar/lounge, and a full-service kitchen with two Type 1 grease hoods and a dish machine, along with other typical commercial kitchen equipment. The space is served by two roof-mounted HVAC units, a roof-mounted make-up air unit, and roof-mounted exhaust fans. The level above the tenant space was occupied, so the design provided measures to minimize disruption to those occupants during construction.

  • Operational Efficiency
  • System Integration
  • Occupant Protection
  • Safety and Compliance