
Project description
New electrical service and distribution equipment, including a 100kW generator, UPS, and ATS, was designed for both normal and emergency power. Cator, Ruma & Associates prepared a code analysis and calculations, and provided Archuleta County with multiple options to create a thoughtful design that incorporated all their needs and allowed for future planning and expansion, in coordination with funding phasing.
In addition to providing schematic, design development, and construction documents, we assisted with bid procurement and provided contract administration to verify that installations met the design requirements.
Guiding Principles for the Design
- Safety-First Design
- Controlled System Access
- Flexibility for the future
- Secure Facility Planning
- Sustainable Operations
- Incredibly Efficient
- Heightened Security
- Operational Resilience